Copyright © 2021 WOU 1TBE105/05Academic Session 2021September Semester 3TBE105/05 Basic Surveying and Building ConstructionCourse AssessmentAssignment 1Instructions to candidates:
1.
This Course Assessment (CA) 1 consists of three (5) printed pages.
2.
CA 1 is based on the topics covered in Unit 1: Surveying and Unit 2: Preliminaries, External Works, andFoundations. Unit 3 Introduction to Walls, Floors, and Roofs and Unit 4: Structural Frame.
3.
Answer all three (3) questions in English.
4.
You can answer the questions using the point form format or the descriptive essay format with proper citationdepending on the type of question. Marks will be awarded for quality content and presentation.
5.
You have to submit your CA 1 with your WOU student ID, class ID, and name stated on the front cover page ofyour CA 1.
6.
Submission of CA 1 in hard copy will not be accepted. You have to submit your CA 1 via the OAS system andit is your responsibility to submit it on or before the closing date for submission. Please check FlexLearn for theassignment submission deadline.
7.
This is an individual assignment. No duplication of work will be tolerated.
TBE105/05Copyright © 2021 WOU 2Answer all questions.Question 1
(a)
Area estimation is essential for calculating the volume of earthwork involved in aconstruction site. Referring to Figure 1, calculate the item in (i) and (ii).
Figure 1 (Drawing is N.T.S. Please refer to the measurement indicated)(i) Estimate the area encompassed by the irregular geometry in Figure 1 above usingtrapezoidal rule. Given: Area= x/2[O1 + 2O2 + 2O3+…..+On] (Where, x= Distance orwidth of each strip O1,2,3… n= First, second, third… last offset readings) 4 Marks(ii) Estimate the area encompassed by the irregular geometry in Figure 1 above usingSimpson’s rule. Given: Area= x/3[O1 + 2O + 4E +On]. 4 Marks(iii) In your opinion, which method should give you a more accurate estimation for thearea shown in Figure 1? Is it by using the trapezoidal or Simpson’s rule? Statereasons to support your answer. 3 MarksTBE105/05Copyright © 2021 WOU 3(b) Leveling is an operation required in the determination or the comparison of heights forpoints on the earth surface. With the aid of a sketch, define the following terms:i. Level Datumii. Reduce Leveliii. Horizontal Line 9 Marks(c) Tubular scaffolding is one of the methods in temporary works. With the aid of diagrams,briefly explain Putlog or bricklayer’s scaffold of tubular scaffolds. 5 MarksQuestion 2Site preparation and land surveying works are two crucial stages for the commencement of a newconstruction project. You are required to prepare a report on site preparation and landsurveying works. In the report, the following items need to be included:(a) Introduction. 5 Marks(b) Define the term “site preparation” and “land surveying”. 5 Marks(c) Determine the purposes of site preparation. 5 Marks(d) Discuss the activities/tasks involved during the site works and setting out. 10 Marks(e) Describe the activities involved before and during the commencement of earthwork. 10 Marks(f) Justify the contribution of land surveying works in the site preparation stage. 8 Marks(g) Conclusion. 5 Marks(h) References. 2 MarksAppropriate photographs are to be included where necessary. All references need to be properlycited in an appropriate format. Your report should not be more than 1,500 words.TBE105/05Copyright © 2021 WOU 4Question 3
Have a look around your own house or workplace. You are required to study on the important elements ofthe chosen building.Your report shall discuss the following information:
(a)
Introduction on the type and location of your house (i.e.: bungalow, apartment,townhouse,semi-D, etc.) or office building.
5 Marks
(b)
The construction of the wall which includes:• The profile of the wall• The functional requirements and selection criteria for the wall
6 Marks10 Marks
(c)
The construction of the floor which includes:• The profile of the floor• The functional requirements and selection criteria for the floor
6 Marks10 Marks
(d)
The construction of the roof which includes:• The profile of the roof• The functional requirements and selection criteria for the roof
6 Marks10 Marks
(e)
The construction of the structural frame which includes:• The profile of the structural frame• The functional requirements and selection criteria for the structural frame
6 Marks10 Marks
(f)
Fire safety of the building which includes:• The factors that have been adopted for fire protection in the building
10 Marks
(g)
Conclusion
4 Marks
(h)
Reference
2 Marks
Appropriate photographs, figures, records, schematic diagram, schedules, specification are tobe included where necessary. All references need to be properly cited. Suggested numberof words is about 4,000.
TBE105/05Copyright © 2021 WOU 5END OF QUESTION PAPER